ReMe/.github/PULL_REQUEST_TEMPLATE.md
jinliyl ef3f99f019
refactor(packaging): reorganize published packages (#495)
* refactor(packaging): reorganize published packages

* fix(packaging): install AgentScope extra in wheel smoke

* docs: align package guides and documentation site

* ci(workflow): add core dependency verification step in Python package build

- Add a workflow step to verify released core dependencies by installing the wheel with core extras
- Assert the presence of the static index.html file to ensure proper package contents
- Create and use a temporary virtual environment for isolation during verification
- Keep existing artifacts upload step intact and conditional on inputs.upload_artifacts flag

* fix(ci): update package installation dependencies in Windows workflow

- Change pip install from editable reme_studio and core to only dev and as extras
- Remove installation of reme_studio and core to streamline dependency setup
- Ensure Windows CI uses the correct extras for testing environment

* fix(tests): add missing commas in toml file reads in package version tests

- Added trailing commas in the tomllib.loads calls for auto-fin and daily_paper configs
- Ensured consistent syntax to prevent potential tuple misinterpretation
- Improved readability and correctness of the test setup code

* fix(packaging): protect qwenpaw releases and test Studio health
2026-08-27 14:02:09 +08:00

35 lines
1.3 KiB
Markdown

## Summary
<!-- Explain the problem and the smallest coherent change that addresses it. -->
## Related issue
<!-- Use "Fixes #123" when applicable. -->
## Contract and data impact
- [ ] No public configuration, schema, CLI, endpoint, streaming, or workspace-layout contract changes
- [ ] No user-owned memory files are deleted or rewritten
- [ ] Derived indexes, catalogs, graphs, caches, and metadata remain rebuildable
<!-- If any item is unchecked, describe the impact and migration or recovery path. -->
## Validation
<!-- List the exact checks run and their results. Explain relevant checks that were not run. -->
- [ ] Focused tests pass
- [ ] Unit tests pass, or omitted tests are explained below
- [ ] `pre-commit run --all-files` passes, or omitted checks are explained below
- [ ] Frontend checks were run when `reme_studio/` changed
## Checklist
- [ ] I reviewed the diff for unrelated changes and sensitive data
- [ ] Tests cover intentional behavior changes
- [ ] Defaults, schemas, and concise documentation were updated together when required
- [ ] Long-lived clients, tasks, services, and executors follow the application lifecycle
## Screenshots or additional notes
<!-- Include UI screenshots, compatibility notes, or follow-up work when relevant. -->