# Design: Parallel Work Stream Visualization
**Status:** Design Draft
**GitHub Issue:** #43
**Priority:** Medium
## Overview
Add a timeline/swimlane view to visualize parallel task execution, showing which tasks ran concurrently, how long each took, and where bottlenecks occurred.
## Use Cases
1. **Multi-agent sprint review** — After spawning 12 parallel agents, see which completed first, where time was spent
2. **Bottleneck detection** — Identify tasks that blocked others or took unexpectedly long
3. **Capacity planning** — Understand actual parallelism achieved vs theoretical max
4. **Sprint retrospective** — Visualize sprint execution for process improvement
## Proposed Architecture
### Data Model
The timeline view will use existing data:
- `task.timeTracking.entries[]` — Start/end times per task
- `task.status` — Current state
- `task.agent` — Assigned agent
- `activity-log.json` — Status change timestamps
New fields (optional):
- `task.parallelismGroup` — Group related parallel tasks
- `task.dependsOn[]` — Explicit dependencies for visualization
### API Endpoints
```typescript
// Timeline data for a date range
GET /api/analytics/timeline
Query: { from: ISO, to: ISO, agent?: string, project?: string }
Response: {
tasks: [{
id: string,
title: string,
agent: string,
segments: [{ start: ISO, end: ISO, status: string }]
}],
metrics: {
parallelismFactor: number,
throughput: number,
avgLeadTime: number
}
}
// Aggregate metrics for a sprint
GET /api/analytics/metrics
Query: { sprint?: string, from?: ISO, to?: ISO }
Response: {
tasksCompleted: number,
avgDuration: number,
parallelismPeak: number,
agentUtilization: Record<string, number>
}
```
### UI Components
```
┌─────────────────────────────────────────────────────────────┐
│ [Kanban] [Timeline] [Dashboard] 🔍 Filter 📅 │
├─────────────────────────────────────────────────────────────┤
│ 2026-02-05 8:00 9:00 10:00 11:00 │
├─────────────────────────────────────────────────────────────┤
│ veritas │███████████████████████│ │
│ │ REL-001 │ │
├─────────────────────────────────────────────────────────────┤
│ codex-1 │ │█████│ │
│ │ │REL-2│ │
├─────────────────────────────────────────────────────────────┤
│ codex-2 │ │████████│ │
│ │ │ REL-3 │ │
├─────────────────────────────────────────────────────────────┤
│ codex-3 │ │██████████████│ │
│ │ │ REL-4 │ │
└─────────────────────────────────────────────────────────────┘
```
**Components needed:**
1. `TimelinePage.tsx` — New page at `/timeline`
2. `TimelineChart.tsx` — Gantt-style visualization (use @nivo/gantt or custom)
3. `TimelineFilters.tsx` — Date range, agent, project filters
4. `ParallelismMetrics.tsx` — Key metrics cards
### Implementation Phases
**Phase 1: Data Layer (2-3 hours)**
- [ ] Add timeline API endpoint
- [ ] Aggregate time tracking data into segments
- [ ] Calculate parallelism metrics
**Phase 2: Basic UI (4-6 hours)**
- [ ] Create TimelinePage with navigation
- [ ] Implement basic Gantt chart (horizontal bars)
- [ ] Add date range picker
**Phase 3: Polish (2-4 hours)**
- [ ] Add swimlanes per agent
- [ ] Color-code by task type/status
- [ ] Zoom levels (hour/day/week)
- [ ] Hover tooltips with task details
**Phase 4: Integration (2 hours)**
- [ ] Link from task cards to timeline position
- [ ] Add to dashboard as widget option
## Technical Decisions
**Chart Library Options:**
1. `@nivo/gantt` — React-native, good for static Gantt charts
2. `react-gantt-schedule-timeline-calendar` — Feature-rich but heavy
3. Custom with D3 — Maximum flexibility, more work
4. CSS Grid + custom — Simplest, good for MVP
**Recommendation:** Start with CSS Grid + custom for MVP, migrate to @nivo if needed.
## Dependencies
- Existing time tracking data must be populated
- Status history service provides state change timestamps
## Risks
1. **Data gaps** — Tasks without time tracking won't appear
2. **Performance** — Large date ranges with many tasks may be slow
3. **Complexity** — Full Gantt features (drag, resize, dependencies) add significant scope
## Success Metrics
- Users can identify which tasks ran in parallel
- Average parallelism factor is visible
- Sprint retrospectives use the timeline view