mirror of
https://github.com/BradGroux/veritas-kanban.git
synced 2026-10-10 21:57:53 +00:00
* test: add critical-path coverage ratchets * fix: harden coverage ratchet enforcement * fix: fetch coverage comparison history * fix: close coverage policy downgrade paths * fix: verify changed critical statements * fix: ignore non-executable coverage changes * fix: distinguish mixed type-only coverage edits * fix: classify coverage changes by runtime output * fix: enforce runtime-significant whitespace changes * fix: classify multiline coverage changes as hunks * fix: group equal-line coverage rewrites
101 lines
5.6 KiB
Markdown
101 lines
5.6 KiB
Markdown
# Critical-path coverage ratchets
|
|
|
|
Veritas measures risk-weighted execution boundaries instead of presenting one repository-wide
|
|
percentage as a quality claim. The governed policy is
|
|
[`critical-path-coverage.json`](critical-path-coverage.json).
|
|
|
|
## Run the coverage gate
|
|
|
|
```bash
|
|
pnpm test:coverage
|
|
```
|
|
|
|
The command builds `@veritas-kanban/shared`, then runs each applicable workspace from its own
|
|
working directory. It uses one Vitest worker for the lock-sensitive server boundary suite and at
|
|
most four elsewhere. This preserves package-specific path and timeout behavior while collecting
|
|
V8 coverage for `server`, `web`, `cli`, `mcp`, and `desktop`. Server and web execute the governed
|
|
critical-path test files listed exactly in the policy; the smaller CLI, MCP, and desktop suites run completely. Live provider and MCP integration opt-ins are removed from the coverage process environment. The ordinary
|
|
canonical unit gate remains responsible for every test. Coverage requires no live credentials or
|
|
external services.
|
|
|
|
To measure only the packages selected by CI:
|
|
|
|
```bash
|
|
pnpm test:coverage --packages server,web
|
|
```
|
|
|
|
Each measured package writes HTML, `coverage-summary.json`, and statement-level
|
|
`coverage-final.json` under `coverage/<package>/`.
|
|
The root `coverage/critical-path-summary.json` and `.md` files contain the machine-readable and
|
|
human-readable boundary results. Coverage output is generated evidence and remains ignored by
|
|
Git.
|
|
|
|
## Governed boundaries
|
|
|
|
The initial floors were measured on 2026-08-23 with Node 22-compatible Vitest 4.1.11 and V8. A
|
|
floor is the exact measured percentage, not a rounded repository target. Any lower line, branch,
|
|
function, or statement result fails the gate. CI checks out complete Git history and compares the
|
|
policy with the event's base commit, so removing boundaries or runner inputs, redirecting a
|
|
report, narrowing include patterns, or lowering a floor fails even when the edited policy would
|
|
otherwise pass.
|
|
|
|
| Package | Boundary | Lines | Branches | Functions | Statements |
|
|
| ------- | ------------------------- | -----: | -------: | --------: | ---------: |
|
|
| server | dispatch-runtime | 64.97% | 57.48% | 70.22% | 63.67% |
|
|
| server | auth-validation-redaction | 57.58% | 52.85% | 50.91% | 56.89% |
|
|
| server | storage-locks-migrations | 39.51% | 34.11% | 46.90% | 38.73% |
|
|
| web | api-auth-realtime | 37.74% | 34.36% | 28.67% | 36.79% |
|
|
| cli | api-compatibility | 52.07% | 44.53% | 65.45% | 51.02% |
|
|
| mcp | api-tool-contracts | 52.39% | 43.67% | 60.00% | 51.44% |
|
|
| desktop | preload-ipc-trust | 66.24% | 66.54% | 54.86% | 65.50% |
|
|
|
|
The long-term floor for every critical boundary and metric is 80%. Raise ratchets whenever added
|
|
tests improve a result. Prioritize branches and functions below 80%, starting with the web API,
|
|
authentication, mutation, and realtime boundary. Do not reduce a floor to make CI pass.
|
|
|
|
## CI behavior
|
|
|
|
The deterministic scope selector emits `coverage_packages` separately from ordinary affected
|
|
workspaces. A full verification run measures all five packages. A focused run measures only a
|
|
package whose governed critical-path source or tests changed. CI publishes the complete `coverage/`
|
|
directory for 14 days and writes the boundary table to the job summary. Documentation and
|
|
non-critical source changes do not repeat the coverage suite. Artifact upload uses `always()` so
|
|
partial and failing reports remain available for diagnosis.
|
|
|
|
Broad source patterns in the policy automatically include new files in governed areas. Because
|
|
workspace coverage uses `all: true`, an untested critical file contributes zero coverage and
|
|
drops its boundary. CI additionally rejects every changed governed source file with no executable
|
|
coverage entry or zero covered lines, so stronger coverage elsewhere cannot hide new untested code.
|
|
Every added or modified executable statement in governed source must be covered by the measured
|
|
suite or carry an explicit reviewed exception. The gate reads the base-to-head diff alongside the
|
|
statement-level V8 report, so historical coverage elsewhere in an existing file cannot satisfy the
|
|
new-code test requirement. Comments and type-only edits do not manufacture executable statements.
|
|
Ambiguous mixed rewrites fail closed: if an unequal-line hunk combines runtime-neutral formatting
|
|
with a runtime change and cannot be separated safely, all changed lines in that hunk require
|
|
coverage. This favors enforcement over guessing and bounds the classification work per hunk.
|
|
The authentication boundary includes server Zod schemas and the shared authoritative API
|
|
permission map in addition to middleware and redaction code.
|
|
|
|
## Exclusions and reviewed exceptions
|
|
|
|
Generated output, test files, fixture directories, declaration files, type-only `types.ts` modules,
|
|
and the SQLite test helper are excluded consistently in workspace Vitest configs. Production
|
|
runtime source is not globally excluded.
|
|
|
|
If a critical source file cannot be tested immediately, add a narrow `exceptions` entry to its
|
|
boundary with all four fields:
|
|
|
|
```json
|
|
{
|
|
"path": "server/src/example.ts",
|
|
"reason": "Why automated coverage is not currently practical.",
|
|
"owner": "BradGroux",
|
|
"trackingIssue": "#1234",
|
|
"reviewBy": "2026-09-30"
|
|
}
|
|
```
|
|
|
|
Exception paths must name one exact repository-relative file; globs and traversal are rejected.
|
|
The reason must be substantive, the owner must be a GitHub login, the tracking issue must remain
|
|
linked, and the real ISO review date must fall within 90 days. The pull request must explain the
|
|
compensating verification and receive normal review. Remove the exception when coverage lands.
|