veritas-kanban/docs/V6-VISUAL-TOUR.md

6.7 KiB

Veritas Kanban v6 Visual Tour

The maintained views below come from the signed and notarized 6.3.0 candidate at source c83e72c3. Its 144 native states, six seeded fault probes and three large-board checks passed. All stills and complete GIF/video playback were inspected; the published files retain the exact original captured bytes. Version 6.3.0 is the latest published stable release. See the 6.3.0 release source, evidence packet, and media contract.

Documentation freshness: 2026-10-25. See the 6.3.0 capture provenance. Historical 6.2.0 comparison and capture provenance remain available.

Board And Task Workspace

The board uses the current semantic column states, compact task cards, shared desktop shell, and Workbench affordance. Opening a task replaces the former peer-tab drawer with progressive Overview, Plan, Run, Results, and History modes.

6.3.0 board overview with release-safe tasks

6.3.0 progressive task workspace

6.3.0 board-to-task interaction

Grouped Settings And Command Palette

Settings groups all twenty destinations under Core, Collaboration, Automation, Governance, and System while keeping transfer and danger-zone actions separate. Command+K uses the same current shell and remains bounded to the viewport.

6.3.0 grouped Settings navigation

6.3.0 Command+K palette

Provider Support

Settings -> Agents shows the normalized support tier, installed version/build, configuration readiness, certification freshness, limitations, and remediation from the same harness-support-profile/v1 and harness-compatibility-matrix/v1 records used by vk doctor --json, API diagnostics, dispatch, and telemetry.

The release capture must use dummy profile names and contain no login state, environment values, provider output, private paths, or credentials.

6.3.0 provider settings with current grouped navigation

Expected visible behavior:

  • Buzz, Grok Build, Codex app-server, Claude Code, and GitHub Copilot CLI show their reviewed exact build and source-availability caveat.
  • Disabled installed profiles read Detected rather than Certified.
  • Stale/unknown builds read Degraded or Unsupported with an actionable reason.
  • Provider controls unsupported by the current manifest are not presented as silently available.

Buzz Integration

Settings -> Notifications -> Buzz Connection keeps relay communication separate from Buzz Agent execution. The connection view exposes reference-only URLs, public identity, environment-variable references, compatibility facets, one-channel mappings, definition preview/import, trigger rules, and bounded audit state.

6.3.0 communication health, Buzz, and reply-adapter settings

Expected visible behavior:

  • private keys and auth tags appear only as environment reference names;
  • compatibility failure disables delivery;
  • persona/team import is preview-first and creates disabled objects;
  • workflow triggers accept root message.posted only;
  • replay, reply, edit, delete, reaction, echo, and disabled-rule dispositions are visible without launching duplicate workflow runs.

Approval And Run Evidence

Task Detail and shared-run views project the causal run-event/v1 journal, exact-action approval requests, conversation lifecycle controls, tool/MCP evidence, worktree/launch identity, usage, artifacts, and authoritative completion result.

No public-safe approval was active in the isolated release profile. The text contract below is retained instead of fabricating a passing approval state.

Expected visible behavior:

  • approval copy identifies the exact action and risk without showing secret values;
  • stale, expired, changed, cancelled, or already-decided requests cannot be approved;
  • resume, steer, fork, compact, archive, interrupt, and close appear only when current provider evidence supports them;
  • reconnect replays causal events by cursor without duplicating completion;
  • mobile-safe questions remain separate from filesystem, command, network, permission, and MCP approval.

Workbench, Squad Chat, Maintenance, And Mobile

Surface Current 6.3.0 capture
Workbench Workbench
Squad Chat Squad Chat
Maintenance Maintenance
Mobile board Mobile board
Mobile task Mobile task workspace
Mobile Settings Mobile Settings
Mobile guided tour Mobile flow

Capture Rules

Follow the documentation media contract. Run pnpm docs:capture-media <candidate.app> <new-external-directory> from a clean candidate checkout on macOS. The output directory must not already exist. The runner launches the actual packaged application in an isolated profile, captures the mobile browser separately, and records real interactions at 8 fps. It requires ffmpeg and the pinned Playwright Chromium installation.

The original capture files and manifest remain outside the repository. After visual inspection and complete GIF/MP4 playback, copy the exact bytes to the versioned media paths and commit only documentation/media changes. Run pnpm docs:verify-media <capture/evidence.json> <candidate.app> <capture/publication.json> from that clean documentation commit. This verifies original, committed and working-copy hashes without recapturing or relabeling an older build.

Before publication, retain only verified screenshots captured from an isolated runtime without private data. If a state cannot be safely produced, retain the text contract and record the missing visual evidence in the release packet rather than fabricating a screenshot.

Capture desktop dark/light and compact widths where the state materially changes. Verify keyboard focus, labels, contrast, and recoverable error copy. Never capture credentials, private provider conversations, relay events, tokens, local user paths, or unrestricted diagnostics.