- Resolve conflicts: keep redesigned skills index, take dev's cs-aeo link fix, union of DOMAIN_SEO_CONTEXT entries in generate-docs.py - Regenerate catalog on the merged tree (dev's agent/command description updates, removed ai-seo/release-manager/command-guide, restructured universal-scraping-architect) - Update counters to post-merge truth from scripts/derive_counters.py: 345 skills, 78 plugins (14 bundles + 64 standalone), 570+ Python tools - Add redirects for upstream-removed pages (ai-seo -> aeo, release-manager -> changelog-generator, command-guide -> engineering index) - Add compliance-os bundle to bundle tables; rebuild 78-plugin table from marketplace.json - Teach the generator to rewrite repo-root-relative source links to GitHub URLs — mkdocs build --strict now passes with zero warnings https://claude.ai/code/session_015bYZ97nV4oRb3LbxCRFVcP
74 lines
3.7 KiB
Markdown
74 lines
3.7 KiB
Markdown
---
|
||
title: "/sprint-plan — Slash Command for AI Coding Agents"
|
||
description: "Capacity-gated sprint planning — runs capacity math, carry-over check, and a definition-of-ready gate before committing scope. Usage: /sprint-plan. Slash command for Claude Code, Codex CLI, Gemini CLI."
|
||
---
|
||
|
||
# /sprint-plan
|
||
|
||
<div class="page-meta" markdown>
|
||
<span class="meta-badge">:material-console: Slash Command</span>
|
||
<span class="meta-badge">:material-github: <a href="https://github.com/alirezarezvani/claude-skills/tree/main/commands/sprint-plan.md">Source</a></span>
|
||
</div>
|
||
|
||
|
||
Create a sprint plan for `$ARGUMENTS` with explicit capacity math, a carry-over check, and a definition-of-ready gate. The first token(s) of `$ARGUMENTS` are the sprint goal; a trailing number is treated as team capacity (story points or person-days). If no capacity is given, compute it in Phase 1 — never invent it.
|
||
|
||
## Usage
|
||
|
||
```bash
|
||
/sprint-plan <goal> [capacity]
|
||
# e.g. /sprint-plan "Checkout v2 ready for beta" 34
|
||
```
|
||
|
||
## Phase 1 — Capacity Math (do the arithmetic, show it)
|
||
|
||
1. **Raw capacity** = team size × working days in sprint × focus factor (default 0.7; ask if unknown)
|
||
2. **Deductions** — subtract, explicitly and line by line: holidays/PTO, on-call/support rotation, ceremonies (~10%), known interrupts
|
||
3. **Velocity cross-check** — compare against the rolling average of the last 3 sprints' *completed* (not committed) points. If computed capacity exceeds trailing velocity by >15%, plan to trailing velocity and say so.
|
||
|
||
Output a small table: raw → deductions → net capacity → trailing velocity → planning number.
|
||
|
||
## Phase 2 — Carry-Over Check (before adding anything new)
|
||
|
||
1. List every item carried over from the last sprint (not Done at sprint close)
|
||
2. Re-estimate *remaining* effort — never carry the original estimate
|
||
3. Carry-over consumes capacity **first**; new scope only gets what is left
|
||
4. If carry-over exceeds ~30% of capacity, flag it as a systemic over-commitment signal and recommend a smaller commitment this sprint, not a bigger push
|
||
|
||
## Phase 3 — Definition-of-Ready Gate (per story)
|
||
|
||
A story may enter the committed scope only if **all** of these hold — otherwise it goes to "needs refinement", not the sprint:
|
||
|
||
- [ ] User story has a clear actor, action, and outcome (INVEST-compliant)
|
||
- [ ] Acceptance criteria written and testable
|
||
- [ ] Estimated by the team (not by the planner alone)
|
||
- [ ] Dependencies identified and either resolved or scheduled
|
||
- [ ] Small enough to finish within the sprint (split if not)
|
||
|
||
Generate INVEST-checked stories from an epic with:
|
||
|
||
```bash
|
||
python3 product-team/agile-product-owner/skills/agile-product-owner/scripts/user_story_generator.py
|
||
```
|
||
|
||
## Phase 4 — Output Structure
|
||
|
||
- **Sprint goal** — one sentence; everything committed must serve it
|
||
- **Capacity table** — from Phase 1
|
||
- **Carry-over** — from Phase 2, listed first in committed scope
|
||
- **Committed scope** — stories that passed the DoR gate, summing to ≤ planning number
|
||
- **Stretch scope** — clearly separated; pulled only if committed scope finishes
|
||
- **Risks and dependencies** — with named owners
|
||
- **DoR exceptions** — empty if the gate was honored; otherwise justify each
|
||
|
||
## Repo Assets (verified paths)
|
||
|
||
- Skill: `product-team/agile-product-owner/skills/agile-product-owner/SKILL.md`
|
||
- Sprint planning template: `product-team/agile-product-owner/skills/agile-product-owner/assets/sprint_planning_template.md`
|
||
- Sprint planning guide: `product-team/agile-product-owner/skills/agile-product-owner/references/sprint-planning-guide.md`
|
||
- Story generator: `product-team/agile-product-owner/skills/agile-product-owner/scripts/user_story_generator.py`
|
||
|
||
## Related
|
||
|
||
- `/sprint-health` — mid-sprint health check
|
||
- `/user-story` — single-story generation with INVEST checks
|