Brad Groux
dfae7911cc
chore: release v6.1.2
...
* chore: prepare v6.1.2 release
* chore: refresh reviewed gitleaks fingerprints
* docs: record release gate corrections
* docs: record v6.1.2 release evidence
2026-08-24 08:39:47 -05:00
Brad Groux
2cfb89396d
chore(release): prepare Veritas Kanban 6.1.1
...
Audit and resolve the open contributor and dependency backlog, stabilize the release candidate, synchronize versioned documentation, and prepare the verified 6.1.1 release.
2026-08-22 19:55:58 -05:00
Brad Groux
e5aba49e61
chore: prepare Veritas Kanban 6.1.0 ( #1137 )
...
CI / Select Test Scope (push) Waiting to run
CI / Lint & Type Check (push) Waiting to run
CI / Changed Tests (push) Blocked by required conditions
CI / Workspace Unit Tests (push) Blocked by required conditions
CI / Build (push) Waiting to run
CI / Security Audit (push) Waiting to run
Desktop Artifacts / Unsigned macOS Artifact (push) Has been cancelled
Desktop Artifacts / Unsigned Linux Artifacts (push) Has been cancelled
Desktop Artifacts / Unsigned Windows Artifacts (push) Has been cancelled
* chore: prepare v6.1.0 release
* docs: record v6.1.0 release gate evidence
* test: cover CLI fork idempotency
* test: separate live MCP integration coverage
2026-07-26 06:22:01 -05:00
Brad Groux
4ccec233ca
feat: enforce run-scoped filesystem sandboxes ( #1028 )
...
* feat: enforce run-scoped filesystem sandboxes
* test: complete config service mock
2026-07-25 00:05:14 -05:00
Brad Groux
3a73662b9c
chore(release): prepare v6.0.2 desktop hotfix ( #1011 )
2026-07-24 18:01:56 -05:00
Brad Groux
1c86d90386
chore: prepare v6.0.1 release
2026-07-24 13:43:59 -05:00
Brad Groux
1bd43f9279
release: Veritas Kanban 6.0.0 ( #985 )
...
* build: prepare 6.0.0 release
* docs: link the 6.0.0 release pull request
2026-07-24 11:26:25 -05:00