litellm/.github/workflows
yuneng-jiang dc0a852de9
ci: fit the pull request gate into five minutes (#52660)
* ci(unit): upload per-test durations as JUnit XML from each shard

Each unit shard now writes junit.xml and uploads it, so per-test timings can drive shard balancing and the choice of PR core tests.

* ci: fit the pull request gate into five minutes

Lint no longer compiles Rust. The basedpyright env skips installing the
project (same per-rule counts as main's published artifact, 93220) and runs
with four threads, and the python job installs only the dev tools. Import
safety and the OpenAPI gate move to a lint-runtime job in the unit workflow
that reuses the one shared bridge build.

The unit workflow drops coverage, schedules core shards with worksteal so
one big file no longer runs alone at the end, splits the router tests across
two 16-core shards, adds the frequent out-of-core catchers, and adds a
changed-tests job that runs the PR's changed unit tests plus the tests
mirroring its changed source files. The bridge build skips the gateway
wheel on core-mode pull requests, and merge smoke builds the bridge once
instead of once per job on a cache miss.

rust-test, rust-wheel, image-scan and CodeQL move to the integration
cadence, with a rust-tests label to run the Rust jobs on a pull request.
CodSpeed runs on main only.

* ci: build the Rust bridge on a 16-core runner (temporary cache-miss probe)

* ci: reuse the Rust bridge on cost-map-only pull requests

The bridge embeds the cost map, so a pull request that only edits the cost
map JSON used to rebuild Rust in both unit and smoke, about 7 minutes end to
end. The bridge cache key now splits the Rust inputs from the cost map, and a
cost-map-only pull request falls back to a bridge built from the same Rust
inputs with an older embedded map. cost-map-guard still loads the new JSON
through the Rust catalog, and main rebuilds the bridge on every cost map
change.

Unit's bridge job runs on a 16-core runner, which cut a measured cache miss
from 3.5 to 2.0 minutes for pull requests that do change Rust.

* ci: build smoke's Rust bridge on a 16-core runner
2026-11-18 14:41:04 -08:00
..
auto-close-duplicates.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
check-schema-sync.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
codeql.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
codspeed.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
compat-matrix-image.yml feat(docker)!: one shipped image and one entrypoint beside the Dockerfile (#43332) 2026-11-10 18:32:16 -08:00
conventional-commits.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
cost-map-guard.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
cost-map-pins-recheck.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
create-rc-branch.yml ci: cut the weekly rc branch on Monday 3am PT instead of Friday (#49472) 2026-10-31 12:32:23 -07:00
create-release-branch.yml ci(release): create stable/X.Y.x line branch on X.Y.0 tags (#29457) 2026-06-01 15:56:34 -07:00
duplicate_issue_check.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
e2e_record_replay.yml ci(e2e): record the e2e suite weekly and replay it on weekdays with zero egress (#38163) 2026-08-24 23:49:03 -04:00
guard-fork-dependencies.yml chore: move workspace packages under litellm (#51000) 2026-11-12 04:19:57 +00:00
image-scan.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
interactions-spec-canary.yml feat(interactions): forward continuation_token and type requires_continuation so callers can resume a long decode (#50151) 2026-11-05 15:38:44 -08:00
issue-keyword-labeler.yml chore: fixes 2026-04-05 01:30:57 -07:00
issue_classifier.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
issue_fixed_comment.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
issue_label_claude_code.yml ci(issue-classifier): name every workflow, script and job after the issue it works on 2026-09-18 11:37:55 -07:00
issue_label_sync.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
linear-release.yml ci: sync the weekly release cycle with Linear releases (#43636) 2026-09-28 17:00:56 -07:00
mutation-test.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
osv-scan.yml chore: move ui and vscode-extension under litellm and delete docs (#50992) 2026-11-12 04:19:57 +00:00
publish-lint-base-counts.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
root-entry-limit.yml ci: fail when the repo root grows past 15 entries (#51007) 2026-11-12 04:19:58 +00:00
scorecard.yml chore: fixes 2026-04-05 01:30:57 -07:00
spend-logs-guard.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
stale.yml chore: fixes 2026-04-05 01:30:57 -07:00
sync-schema.yml chore: move scripts and runtime sources under litellm (#51006) 2026-11-12 04:19:57 +00:00
test-e2e-redis-chaos.yml test(e2e): rename load to perf and consolidate the opt-in into E2E_PERF_TESTS (#46077) 2026-10-12 13:54:03 -07:00
test-integration.yml ci(integration): point the rust gateway install step at litellm/packaging (#51743) 2026-11-14 13:36:57 +09:00
test-linting.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
test-mcp-dependency-resolution.yml ci(mcp-deps): build unoptimized in the MCP dependency resolution workflow (#51684) 2026-11-13 19:17:44 +00:00
test-merge-smoke.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
test-rust-db.yml feat(auth): read virtual keys, jwt key mappings and model access groups through rust repositories (#52173) 2026-11-18 03:53:37 +00:00
test-rust.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
test-terraform-modules.yml chore: move deployment sources under litellm/deploy (#50981) 2026-11-12 04:19:56 +00:00
test-terraform-provider.yml ci: stop PR runs from thrashing the Actions cache and stop smoke compiling from source (#51343) 2026-11-11 23:52:32 -08:00
test-unit.yml ci: fit the pull request gate into five minutes (#52660) 2026-11-18 14:41:04 -08:00
test-vscode-extension.yml chore: move ui and vscode-extension under litellm and delete docs (#50992) 2026-11-12 04:19:57 +00:00
zizmor.yml ci: run zizmor with --no-ignores and move the spend logs and cost map guards to pull_request (#48947) 2026-10-28 17:44:48 -07:00